Ga naar hoofdinhoud
PUURMODULAIR
  • Construction Timber

    • C24 Structural Timber
    • BSH Glulam Beams
    • Turned Logs
    • Sawn Timber & Decking

    Garden & Landscape

    • Half-Round Logs
    • Garden Palisades
    • Outdoor Decking

    Sauna & Wellness

    • Saunas

    Decorative Elements

    • Decorative Elements
    • Accessories

    Bespoke

    Custom specifications tailored to your project.

    Request Quote
  • Homes
  • Knowledge Base
  • Calculator
  • B2B
Contact
PUURMODULAIR

Premium European timber specification for architects, builders, and dealers.

Products

  • Modular Homes (PM35 / PM70)
  • Structural Timber
  • Glulam Beams
  • Sauna Interiors
  • Decking & Cladding
  • Garden Palisades
  • All Products →

Resources

  • Knowledge Base
  • Species
  • Templates
  • Q&A

Company

  • B2B
  • Contact
  • Privacy Policy
  • Terms & Conditions
  • Cookie Policy

Contact

AllPoint Sp. z o.o.

Aleja "Solidarności" 155/6
00-877 Warszawa
Poland

info@puurmodulair.com

+48 723 550 555

REGON: 221597538

NIP: 5851463808

© 2026 AllPoint Sp. z o.o. All rights reserved.

Designed by Brand House

Wij respecteren uw privacy

Wij gebruiken cookies om uw ervaring te verbeteren. U kunt kiezen welke cookies u accepteert.

  1. Home
  2. Knowledge Base
  3. How much does transport add to timber cost?

procurement · Answer

How much does transport add to timber cost?


Quick Answer

Transport typically adds 10–25% to the ex-mill timber price for deliveries within Northern Europe (500–2,000 km). Breakdown: road transport costs €0.05–€0.12...

How much does transport add to timber cost?

Transport typically adds 10–25% to the ex-mill timber price for deliveries within Northern Europe (500–2,000 km). Breakdown: road transport costs €0.05–€0.12 per tonne-km; rail is €0.02–€0.05 per tonne-km; sea freight is €0.01–€0.03 per tonne-km.

Transport typically adds 10–25% to the ex-mill timber price for deliveries within Northern Europe (500–2,000 km). Breakdown: road transport costs €0.05–€0.12 per tonne-km; rail is €0.02–€0.05 per tonne-km; sea freight is €0.01–€0.03 per tonne-km. A typical delivery of structural timber from Scandinavia to the Netherlands (1,200 km by sea + road) adds approximately €30–€60 per m³ to the ex-mill price. Consolidating orders into full truck loads (24–26 m³) significantly reduces per-unit transport cost.

Why this matters

This question relates to Timber Pricing Factors: What Drives Cost in 2026, which covers the broader topic in detail. Understanding this specific aspect helps architects, builders, and timber dealers make informed specification decisions.

For full context and additional technical detail, see our comprehensive guide:

→ Timber Pricing Factors: What Drives Cost in 2026

Related questions

  • What factors affect structural timber prices in 2026?
  • Is timber more expensive in 2026 than previous years?
  • Why is C24 more expensive than C16 timber?

About this answer

This answer is part of the PuurModulair Knowledge Base — comprehensive timber specification guidance for architects, builders, and dealers across the UK, EU, and Scandinavia. All technical content is reviewed by qualified timber technologists before publication.

Read the Full Guide

Timber Pricing Factors: What Drives Cost in 2026

Understanding what drives timber prices in 2026. Covers market factors, species pricing tiers, grade premiums, transport costs, seasonal patterns, and strategies for optimising procurement value.

Read full guide

Related Questions

  • What factors affect structural timber prices in 2026?
  • Is timber more expensive in 2026 than previous years?
  • Why is C24 more expensive than C16 timber?

Need a tailored answer?

Speak to a timber specialist

Get a project-specific specification from our technical team within one business hour.

Request Quote